menu
Dún Laoghaire Baths

Dún Laoghaire Baths

Log in to create a list

Saturday 15 October

Proposals for works at the Baths site from Newtownsmith to the East Pier were approved by Dún Laoghaire Rathdown County Council in November 2015. The proposed works include: full refurbishment of the existing Baths Pavilion to accommodate studio space for artists, an art gallery, a café and public toilet facilities, demolition and clearance of all other derelict structures on the site, provision of a public walkway through the site connecting the coastal walkway at Newtownsmith to the East Pier, provision of defences against coastal erosion on the landward side of the existing swimming pools, refurbishment of the area between the Baths site and the East Pier including the old Bandstand, construction of a new jetty and an area for changing to provide enhanced access to the water for swimmers at all stages of the tide. It is proposed to commence works in early 2017 with works expected to be complete in the summer of 2018.

Places on this tour will be distributed using a lottery, which has now closed. This tour is not suitable for children.

Designed by: DLR Architects Department
Building Date: 1906-1908

Booking Lottery

Places on this tour will be distributed using a lottery, which has now closed. Winners will be notified of their tour details ahead of the Open House Dublin weekend. Most of the Open House Dublin tours are operated on a First Come, First Served basis. So if you missed out on this lottery, make sure to check out the rest of the programme!